Orcas Excavation sculpted the driveway and dug the septic tank location and storm water well. They did a great job and are coming in on budget. Folly farm also got a little beat up with the construction traffic. So, they fixed that up too.
Ken Blair also completed the installation of the water tanks and filter system. All that's left to do there is back-fill around the tanks and a walk-through of the system.
The septic tank was poured last week and the drain field will be installed soon.
Other than that, the electricity is on in the house and the cross-bracing was installed on the metal posts.