My wife and I are building a modern modular home [by Method Homes] on Orcas Island. Watch the progress and see the construction complete by the end of 2010 (January 2011) (February 2011).
Links to Inspirations and Collaborators
Tuesday, August 24, 2010
Let the Building Begin
Sunday, August 8, 2010
Interior Finishes Chosen
We met with the cabinetmaker, Wes from Smith and Vallee http://www.smithandvallee.com this weekend. Smith and Vallee will provide the kitchen cabinets, desk spaces, and media cabinet. We have also chosen the appliances so that the cabinets can be custom fit.
We have made the final decisions on interior finishes. The picture shows the materials which includes black walnut veneer (cabinets, desk area, and vanities), hemlock vertical grain (ceiling and sils), Teragren Synergy strand bamboo flooring http://www.teragren.com/, Polar White Eco by Constentino (counter tops) http://www.ecobycosentino.com/, Fondavalle Pietra Dura 18x18 tile, and black river stone accents http://www.vasqueztile.com/.